The new fire station needed to be brought up above the flood plain which required approximately 4,000 CY of fill to be brought in, placed and compacted. The project also included instillation of water lines, storm sewer, storm drain manholes, catch basins, sanitary sewer, fire hydrants, sidewalk and curb, paving of parking lot and construction of retaining wall and footings.