The Baum Habitat Improvements consisted of the construction of a new side channel, two large log jam structures were, along with 10 smaller woody debris jams.
In all, approximately 65 large trees with rootwads were placed, with another 65 smaller diameter pieces of tops and smaller trees for use as racking.